On
completion of the project at Borough Grange, the Energy Minister,
Rt Hon Malcolm Wickes, MP visited the premises in order to officially
turn on the Solar Panel System. The installation of the solar panels
was an inspired environmental idea of the client and consultancy team.
The
solar panels were installed on one of the highest parts of the building
and faced south. They were installed as a pre-heating system for the
heating generators to conserve energy and pre-heat the water.
Complementary
to this system, a remotely controlled "Pillinger" control
system was installed. This system monitors the ambient temperature
within each dwelling and can be remotely checked and assessed via
a telephone line and modem.